LANDSON / MUNICIPAL WATER
MUNICIPAL DRINKING WATER AT SCALE
MUNICIPAL DRINKING WATER AT SCALE
MUNICIPAL DRINKING WATER AT SCALE
Proposed containerized flat-sheet SiC system for river water with coagulation, oxidation and disinfection.
Proposed containerized flat-sheet SiC system for river water with coagulation, oxidation and disinfection.
Proposed containerized flat-sheet SiC system for river water with coagulation, oxidation and disinfection.

Treatment challenge
Treatment challenge
Treatment challenge
A proposed municipal drinking-water project needs high-throughput filtration of river water in a standardized, deployable treatment system.
A proposed municipal drinking-water project needs high-throughput filtration of river water in a standardized, deployable treatment system.
Landson SiC membrane solution
Landson SiC membrane solution
Landson SiC membrane solution
A containerized Landson SiC flat-sheet membrane (FSM) system integrates online micro-coagulation and oxidation, membrane filtration, and downstream disinfection.
A containerized Landson SiC flat-sheet membrane (FSM) system integrates online micro-coagulation and oxidation, membrane filtration, and downstream disinfection.
Reported performance and operating conditions
Reported performance and operating conditions
Reported performance and operating conditions
Designed capacity 35,000 m³/day; target water recovery >97%; design membrane flux 250 LMH.
Designed capacity 35,000 m³/day; target water recovery >97%; design membrane flux 250 LMH.
Technical configuration
Technical configuration
Technical configuration
River-water source · SiC flat-sheet membranes · Containerized modular design · Micro-coagulation → oxidation → filtration → disinfection.
River-water source · SiC flat-sheet membranes · Containerized modular design · Micro-coagulation → oxidation → filtration → disinfection.
Project status and significance
Project status and significance
Project status and significance
Planned commissioning in early 2027. Figures describe project design targets, not measured operating performance.
Planned commissioning in early 2027. Figures describe project design targets, not measured operating performance.
Interpreting the results
Interpreting the results
Interpreting the results
This is a proposed project. Capacities and recovery figures are design targets, not verified operating results.
This is a proposed project. Capacities and recovery figures are design targets, not verified operating results.
35,000 m³/day Designed treatment capacity · >97% Target water recovery
35,000 m³/day Designed treatment capacity · >97% Target water recovery