Capturing valuable fine hydroxide particles from acidic and alkaline washing streams after filter-press treatment.

Capturing valuable fine hydroxide particles from acidic and alkaline washing streams after filter-press treatment.

Capturing valuable fine hydroxide particles from acidic and alkaline washing streams after filter-press treatment.

Treatment challenge

Treatment challenge

Treatment challenge

Fine metal hydroxide particles passed through a conventional filter press during hydrometallurgical washing, leading to loss of valuable rare-earth material.

Fine metal hydroxide particles passed through a conventional filter press during hydrometallurgical washing, leading to loss of valuable rare-earth material.

Landson SiC membrane solution

Landson SiC membrane solution

Landson SiC membrane solution

Landson SiC cross-flow filtration treats the washing liquor after the filter press to retain fine particles and improve recovery.

Landson SiC cross-flow filtration treats the washing liquor after the filter press to retain fine particles and improve recovery.

Reported performance and operating conditions

Reported performance and operating conditions

Reported performance and operating conditions

Installed permeate capacity ≥20 m³/h; filtration flux ≥350 LMH; residual target metal in permeate <50 mg/L; permeate turbidity <5 NTU; suspended solids <10 mg/L; cleaning interval ≥15 days.

Installed permeate capacity ≥20 m³/h; filtration flux ≥350 LMH; residual target metal in permeate <50 mg/L; permeate turbidity <5 NTU; suspended solids <10 mg/L; cleaning interval ≥15 days.

Technical configuration

Technical configuration

Technical configuration

Phase 1 configuration: 2 series × 3 parallel · Cross-flow filtration · Phase 2: ≥50 m³/h planned.

Phase 1 configuration: 2 series × 3 parallel · Cross-flow filtration · Phase 2: ≥50 m³/h planned.

Project status and significance

Project status and significance

Project status and significance

Commissioned October 2025. Following the first phase, the customer confirmed an expansion with ≥50 m³/h required permeate capacity, planned for commissioning by the end of 2026.

Commissioned October 2025. Following the first phase, the customer confirmed an expansion with ≥50 m³/h required permeate capacity, planned for commissioning by the end of 2026.

Interpreting the results

Interpreting the results

Interpreting the results

This is an operating installation. The first-phase values are reported operational figures; the additional ≥50 m³/h capacity is a planned expansion, not an achieved result.

This is a proposed project. Capacities and recovery figures are design targets, not verified operating results.

≥20 m³/h Installed permeate capacity · ≥350 LMH Filtration flux

≥20 m³/h Installed permeate capacity · ≥350 LMH Filtration flux